3936c515-e657-42f7-b499-377a5fed2d91

3936c515-e657-42f7-b499-377a5fed2d91


Latest News

VicGrid release corridor and draft preferred route for Gippsland transmission

VicGrid has released the corridor and draft preferred route for the transmission to connect offshore wind energy from Gippsland to the electricity grid, aiming...