The stand-off between unions, UGL, Esso security and police continues outside Longford Gas Plants as the protest approaches 190 days and Christmas nears.
Let's Stay Connected
There’s no better way to stay connected with your local community than with a digital subscription to the Gippsland Times.
VicGrid has released the corridor and draft preferred route for the transmission to connect offshore wind energy from Gippsland to the electricity grid, aiming...